Product Update

October 21, 2024

New Support Resource: Commissioning Guide for EI Residential (US)

Includes the setup process for the EI Inverter, Battery, ATS & Generator (US)
Watch the full webinar on demand
Arrow
New Support Resource: Commissioning Guide for EI Residential (US)

New Support Resource: Commissioning Guide for EI Inverter, Battery, ATS & Generator (US)

We’re excited to share a new support article designed to streamline the commissioning process for solar installers using the EI Inverter, EI Battery, Automatic Transfer Switch (ATS), and Generator in the U.S.

This step-by-step Commissioning Guide provides clear instructions for configuring and optimizing each component in the Tigo EI App, ensuring smooth setup and operation. Whether you’re working with individual products or a full system, this guide will help you navigate commissioning efficiently.

🔗 Read the full Commissioning Guide here

Make sure to explore the article before your next installation to ensure a quick and seamless commissioning process.

For more technical resources, visit our Support Center.

‍

News articles

VIEW ALL
Previous
Next

Blog posts

VIEW ALL
Previous
Next
Sign up for our newsletter
Thank you for signing up!
Oops! Something went wrong while submitting the form.