Application Note: Tigo EI (US) Multi-Inverter Commissioning in PPL Electric Utility
Select the desired document language using the blue link below
English
1
002-00230-00
November 21, 2025
Additional information
To enable multi-inverter installations in the PPL (Pennsylvania) utility territory, each inverter in the system must be individually addressable by a Utility Control Device (UCD). This requires assigning a unique Modbus ID to each inverter.
Product(s):

Sign up for our newsletter
Oops! Something went wrong while submitting the form.
Looking for additional information?
We're here to help with any questions